Project :

DePuy Synthes Phase 1

Address :

Ringaskiddy, Cork

Time :

October 2013 to December 2014

Award :

€4.6 Million

Works included:

Phase 1 – Groundworks

  • 10km of ducting.
  • 2km of pumped foul with 2 Nr pump stations.
  • 2km of fire main.
  • 2km of potable water.
  • 2km of 160mm gas line.
  • All services connected to the national systems with full traffic plans in place.
  • 500m of storm water pipe laid including a new out let to sea.
  • Crossed under or over 124 uncharted services without causing damage.
  • Widening and realigning of a 1km section of live road within the site.
  • 2km of permanent boundary fence.
  • Up to 30 employees, 35000-man hours, 250000lts of diesel used.

Phase 2 (Demolition)

  • Strip out of a 4-floor 10000m2 building.
  • Fabrication and construction of a giant steel chute.
  • Knocking and removing 8000 tons of concrete block work.
  • Removal of 820 tons of steel.
  • 7000m2 of false and walk-on ceilings.
  • Removal of 8000m2 of terrazzo from flooring.
  • 5500m of internal pipe work and wrapping.
  • 33km of internal cabling.
  • 380 doors, 23 stairs, 17 gantry’s, 1 tablet making machine and mill weighing 16 tons.
  • 92% of all materials went for recycling.
  • Up to 70 employees, 70000-man hours, 250000lts of diesel used.