Groundworks

DS2 Pfizer Dublin

DS2 Pfizer’s Project
DS2 Pfizer’s Project

Project :

DS2 Pfizer’s

Address :

Clondalkin, Dublin

Time :

February 2016 to February 2017

Award :

€5.5 Million

Works included:

  • Setting up contractor’s carpark and compound to accommodate 900 construction workers.
  • Rerouting of critical services such as mains power, fire mains, water mains, coms and 1000m of steel 150mm welded gas pipe line, all works completed within a live campus.
  • Bulk excavation and rock breaking of 50,000m3 moved to a on-site berm, crossing live campus roads.
  • Excavation of foundations.
  • 600 car parking spaces and roads adjacent to a live plant, including all services, fill, kerbing, tar, line marking and signage.
  • All site services including storm water from 405mm to 150mm.
  • 5km of ducting, 500m of fire main, 500m of potable water, 500m of foul.
  • 7km of permanent and temporary fencing.
  • 50000m3 of berms and top soiling.
  • 1250m of hoarding.
  • Up to 40 employees, 50000-man hours, 300000lts of diesel used.
  • Supply of a full-time road sweeper, wheel washes to accommodate dump trucks working within the site, wheel bath to accommodate trucks leaving the site.